National Tsing Hua University Institutional Repository:Application control chart concepts of designing a pre-alarm system in the nuclear power plant control room
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 54367/62174 (87%)
造访人次 : 14343073      在线人数 : 38
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTHU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    National Tsing Hua University Institutional Repository > 工學院  > 工業工程與工程管理學系 > 期刊論文 >  Application control chart concepts of designing a pre-alarm system in the nuclear power plant control room


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://nthur.lib.nthu.edu.tw/dspace/handle/987654321/46934


    题名: Application control chart concepts of designing a pre-alarm system in the nuclear power plant control room
    作者: Hwang, Sheue-Ling;Lin, Jhih-Tsong;Liang, Guo-Feng;Yau, Yi-Jan;Yenn, Tzu-Chung;Hsu, Chong-Cheng
    教師: 黃雪玲
    日期: 2008
    出版者: Elsevier
    關聯: Nuclear Engineering and Design, Volume 238, Issue 12, December 2008, Pages 3522-3527
    关键词: Simulated annealing
    Power plants
    Nuclear power plants
    Nuclear industry
    Nuclear energy
    Flowcharting
    Electric power plants
    Alarm systems
    Control rooms (power plants)
    摘要: This study applied the concepts of the Shewhart control chart to design a pre-alarm system for the nuclear power plant control room. As a support in detecting faults, the pre-alarm system reminded the operators of a change in the system state in its early stages. Two pre-alarm types were designed to compare with the original system, and all participants were requested to monitor each simulated system under both normal and abnormal states. The tasks for the participants included shutting down the reactor, searching for procedures, monitoring system parameters and executing secondary tasks. In each trial, the task performance, mental workload and situation awareness (SA) of the participants were measured. Results indicated that participants had lower mental workload, but equal SA, when monitoring the system with either type of pre-alarm designs, and lower alarm frequency and higher secondary task performance were obtained with the pre-alarm design. Therefore, the pre-alarm system effectively assisted the operators in monitoring tasks.
    URI: http://www.elsevier.com/
    http://nthur.lib.nthu.edu.tw/dspace/handle/987654321/46934
    显示于类别:[工業工程與工程管理學系] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML1147检视/开启


    在NTHUR中所有的資料項目都受到原著作權保護,僅提供學術研究及教育使用,敬請尊重著作權人之權益。若須利用於商業或營利,請先取得著作權人授權。
    若發現本網站收錄之內容有侵害著作權人權益之情事,請權利人通知本網站管理者(smluo@lib.nthu.edu.tw),管理者將立即採取移除該內容等補救措施。

    SFX Query

    與系統管理員聯絡

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈