English  |  正體中文  |  简体中文  |  Items with full text/Total items : 54367/62174 (87%)
Visitors : 10067267      Online Users : 125
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTHU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    National Tsing Hua University Institutional Repository > 科技管理學院  > 服務科學研究所 > 期刊論文 >  Scheduling printed circuit board production systems using the two-level scheduling approach


    Please use this identifier to cite or link to this item: http://nthur.lib.nthu.edu.tw/dspace/handle/987654321/84796


    Title: Scheduling printed circuit board production systems using the two-level scheduling approach
    Authors: Fu-Ren Lin;Michael J. Shaw;Angela Locascio
    教師: 林福仁
    Date: 1997
    Publisher: Elsevier
    Relation: Journal of Manufacturing Systems, Elsevier, 16(2), Pages 129-149, 1997
    Keywords: Due Date Assignment
    Lot Sizing
    Sequencing
    Synchronous Manufacturing
    Two-Level Scheduling Approach
    Abstract: In a multiple flowline manufacturing system, such as a typical printed circuit board (PCB) production system, scheduling tasks include determining due dates of customer orders, assigning products to daily production, and releasing boards to production lines each day. The main challenge for the scheduling system is to coordinate different production resources so they can work together to improve system performance. The Bi-Level Intelligent Scheduling System (BLISS) was developed, using a two-level scheduling approach integrating product-level and board-level scheduling, to schedule jobs for PCB manufacturing systems under a daily through weekly planning horizon. A utility function is added to determine lot size, and four sequencing rules are evaluated to find the most suitable rule for the scheduling schemes under study. The lot sizing and sequencing decisions are integrated with the simulation module to generate more accurate schedules, with special emphasis put on the need for coordination. Performance of the two-level scheduling approach is evaluated and compared with that of using product-level or board-level scheduling alone under a variety of manufacturing scenarios. The performance is analyzed under various environments such as different degrees of due date tightness, order variation, and product variation. Results show the strength of the two-level scheduling approach, especially in “mission-critical” situations of tight due dates, high variation of orders, and highly changeable products. The findings also provide guidelines for applying those scheduling schemes effectively and efficiently.
    URI: http://www.elsevier.com/
    http://nthur.lib.nthu.edu.tw/dspace/handle/987654321/84796
    Appears in Collections:[服務科學研究所] 期刊論文
    [高階經營管理碩士在職專班] 期刊論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML547View/Open


    在NTHUR中所有的資料項目都受到原著作權保護,僅提供學術研究及教育使用,敬請尊重著作權人之權益。若須利用於商業或營利,請先取得著作權人授權。
    若發現本網站收錄之內容有侵害著作權人權益之情事,請權利人通知本網站管理者(smluo@lib.nthu.edu.tw),管理者將立即採取移除該內容等補救措施。

    SFX Query

    與系統管理員聯絡

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback